Key information relating to this year’s Major Works Projects will posted here.
The Major Works Project to carry out the essential building safety improvements is intended to fix past construction issues, replace unsafe cladding, and ensure proper fire separation between flats. As part of the project, the building’s roof will also be renewed. The information here should be used in conjunction with the communications sent to leaseholders by LBM and the information given to residents provided by our Major Works Surveyor, Ingleton Wood and the onsite teams working for Millane and associated contractors.
Leaseholders can also follow and contribute to the discussion here (leaseholders need to be logged into the site).
Click the “update” headings to see the posts below
UPDATE 19 NOVEMBER 2025: Scaffolding schedule and info
Scaffolding work at the Pad is now well underway. Today Millane issued a variation on the expected schedule, a notification of weekend working and more background information. You can also see the letter to residents here.
The letter contains this Outline of timelines for this project:
- Erection of scaffold to the external facades of the building –5th Nov 2025 approximately 9 weeks
- Christmas break will take place from 19th Dec for 2 weeks
- Removal of current façade 16 Feb 2026 approximately 22 weeks
- Removal and installation of roofs 1 and 2 25th May 2026 approximately 6-7 weeks
- Removal and installation of new decking 20th July 2026 approximately 4 weeks
- Installation of new facades–23rd Feb 2026 approximately 17 weeks
- Removal of scaffold 17th Aug 2026 approximately 7 weeks
General information
- The site working hours will be 8am – 4pm Monday to Friday, with any noisy works starting after 9am. There are no planned works at the weekend, but should this be required, residents and leaseholders will be notified in advance.
- MCS have appointed Samantha Williams as the Resident Liaison Officer for the project. She will be on site 3 to 4 days per week. Her contact details are:
Samantha Williams
RLO1@millane.ltd.uk
07304 070 041
In addition, board director and resident Zoe Adjey has generously offered to act as an on-site point of contact. To make contact with her leave a message with Dean.
- The basement areas will be temporarily converted to serve as the management office and welfare area. Portable toilets will be located in a secured unit near the front of the property due to the access needed to clean them on a weekly basis. Minimal materials will be stored on site, but those materials that are on site will be stowed discreetly on the scaffolding.
- The scaffolding will need to be netted, with monarflex scaffold sheeting in place where the rendered cladding is located.
- There will be approximately 15 staff working at the site.
- Please note that access to flats may be required at various times during the project and we will write to leaseholders and residents with advance notice should access be necessary.
- As with any project of this kind, there will be day-to-day practical issues to consider and logistical problems to solve. As always Dean Hodgetts, the building’s concierge, will be an important point of contact for those in the buildings, and he will work closely with Samantha Williams.